Use a representative board and documented wash, rinse and dry checks to review a batch or inline cleaning process.

PBT Works HyperSWASH III equipment reference

Use a board that is difficult to clean

Select an assembly with shielded areas, connectors or dense parts that retain liquid. Include the intended fixtures and load orientation. Record the flux or other soil, the board materials and the process step that follows cleaning.

Record the handling variables

PBT Works describes HyperSWASH III as a batch spray-in-air system with frames or baskets. Record where the witness board sits and how it drains. Southern Machinery describes a conveyor wash, DI rinse and hot-air dry sequence for SME-6300. Record belt speed and support on that line. Keep these variables fixed when investigating chemistry or service changes.

Check rinse and drying in separate observations

Record the rinse indicator or method agreed for the process. Inspect the assembly after drying, especially under connectors and near fixture contact points. An acceptable rinse reading addresses the measurement it represents. Hidden moisture and residues require their own checks where the product calls for them.

Change one variable during diagnosis

If the result shifts after service, compare nozzle pattern, filter status, bath condition and load arrangement with the saved baseline. Follow the machine and chemistry supplier procedures. Repeat a witness load after a justified change so the improvement can be tied to that change.

Hand off to coating with a defined release check

Record the maximum time and handling conditions between cleaning and the next step if the process requires them. Agree the cleanliness and dryness criteria before preparing an MYC50 coating trial. Use qualified process evidence for any numerical limits.

Qualify curing and extraction for the selected material

Use the coating supplier's cure requirements to decide whether the SAMTRONIK SM-CSUV990 infrared process is suitable. Check the loaded panel rather than relying on the oven setting alone. If an SM-DH1100 extractor is proposed for the workstation, have the site safety team verify capture, filter suitability and discharge requirements for the actual process. Record the extraction setup separately from the coating result.

Technical sources

Equipment enquiries

Discuss the required process